
Installationxxx | xxx17
Figure 2.2: Two-post Flush-mount Configuration
2 Attach one rail to the front post flange with two user-supplied screws (item
2).
3 Slide the plunger bracket forward against the vertical post and secure the
plunger bracket to the post flange with two user-supplied screws (item 3).
4 Repeat this procedure for the second rail.
Komentarze do niniejszej Instrukcji