Dell Force10 Z9000 SystemQuick Start GuidePublication Date: October 2012Regulatory Model: Z9000
8 Installing the HardwareInstall the QSFP+ OpticsThe Z9000 has 32 Quad Small Form-Factor Pluggable Plus (QSFP+) optical ports. For supported optics, r
Installing the Hardware 9• The 40G QSFP+ port must be in a default configuration before you can split it into four 10G SFP+ ports. When you split the
10 Installing the HardwareThe SYS LED does not light up until the boot-up sequence is complete. When the boot-up is complete, the SYS LED is steadily
Installing the Hardware 11Z9000 SpecificationsChassis Physical DesignEnvironmental ParametersAC Power RequirementsParameter SpecificationsHeight 3.48
12 Installing the HardwareDC Power RequirementsPower SuppliesThe Z9000 is designed to support two hot-swappable PSUs. NOTE: If you use a single PSU,
Installing the Hardware 13
14 Installing the Hardware
Installing the Software 152Installing the SoftwareNavigating CLI ModesThe Dell Force10 Operating Software (FTOS) prompt changes to indicate the Comman
16 Installing the SoftwareAccessing the RJ-45 Console Port with a DB-9 AdapterYou can connect to the console using an RJ-45 to RJ-45 rollover cable an
Installing the Software 17Default ConfigurationA version of the FTOS is pre-loaded onto the Z9000 system; however, the system is not configured when y
18 Installing the SoftwareAccess the System RemotelyYou can configure the system to be accessed remotely by Telnet. The Z9000 system has a dedicated m
Installing the Software 19Configure the Management RouteDefine a path from the system to the network from which you are accessing the system remotely.
20 Installing the SoftwareTo configure the enable secret password, follow this step:Create a Port-based VLANThe Default VLAN (VLAN 1) is part of the s
Installing the Software 21To tag interfaces, follow these steps:To move untagged interfaces from the Default VLAN to another VLAN, use the untagged co
22 Installing the SoftwareConnecting the Z9000 to the NetworkAfter you have completed the hardware installation and software configuration, you can co
www.dell.com | support.dell.comPrinted in the U.S.A.
Dell Force10 Z9000 SystemQuick Start GuidePublication Date: October 2012Regulatory Model: Z9000
Notes, Cautions, and Warnings NOTE: A NOTE indicates important information that helps you make better use of your computer. CAUTION: A CAUTION indic
About this Guide 3About this GuideThis document is intended as a Quick Start Guide to get new systems up and running and ready for configuration. For
4 About this Guide
Installing the Hardware 51Installing the HardwarePerform all site preparation before installing the Z9000 system.Installing the Z9000 Chassis in a Rac
6 Installing the HardwareInstall a Chassis into the Rack or CabinetTo install the chassis into a rack or cabinet, follow these steps:2 Attach the brac
Installing the Hardware 7Attach a Ground CableUse a single M4x0.7 screw to attach a ground cable to the Z9000 system. The ground cable is not included
Komentarze do niniejszej Instrukcji