Dell Force10 S55T Instrukcja Szybki Start Strona 9

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 28
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 8
Installing the Hardware 7
Install Chassis into Rack or Cabinet
Ensure that there is adequate clearance surrounding the rack or within the
cabinet to permit access and airflow.
Attach a Ground Cable to the System
The system is shipped with necessary 10-32 screw(s) for attaching a ground
cable to the chassis. The cable itself is not included. Dell Force10 recommends a
6AWG one-hole (for the S55) or two-hole (for the S60) lug, #10 hole size, 63"
spacing (not included in shipping) to properly ground the chassis. The lug must
be a UL recognized, crimp-type lug.
NOTE: The rack installation ears are not suitable for grounding.
CAUTION: Grounding conductors must be made of copper. Do not use
aluminum conductors.
Step Task
1 Dell Force10 recommends that one person hold the chassis in place
while a second person attaches the brackets to the posts.
2 Attach the bracket "ears" to the rack or cabinet posts, using two screws
for each bracket. Ensure the screws are tightened firmly.
S55
S60
PSU0
PSU1
Rack/Cabinet
Post
Rack Mounting
ears
Rack/Cabinet
Post
Rack Mounting
"ears"
PSU0
PSU1
Przeglądanie stron 8
1 2 3 4 5 6 7 8 9 10 11 12 13 14 ... 27 28

Komentarze do niniejszej Instrukcji

Brak uwag