1-8 Rack Installation Guide
+,!
1. From the back of the rack, pull the switch out about 7 centimeters (cm) (about
3 inches).
The switch should lock in place.
2. Attach the end of the cable-management arm to the inner-slide rail by inserting the
two tabs into the two slots until the retaining clip snaps into place (see Figure 1-7).
-'$$)$.
Velcro strips
cable-management arm
tabs
slots
retaining clip
thumbscrew
inner-slide rail
safety release
latch