Physical Groups 71
NOTE: After the device is removed, it still exists in the Device List page. You can
add it to any physical group or logical group when needed.
Moving Devices in a Physical Group
You can move devices to update the group structure that is similar to the
actual data center device structure when a device is moved physically in the
data center.
A server or a chassis can only be moved to another rack. PDU, UPS and
Unsupported devices can be moved to any level of the physical group
structure.
NOTE: The blades are populated automatically to the chassis when the chassis is
added to the rack. If the blades were not discovered when the chassis was added
to the rack, the blades will be shown as Disconnected in the Device List. The status
will be updated to Connected once the blades are discovered through the discovery
process. When the blade is moved physically in the chassis or from one chassis to
another, the Chassis group structure from the Power Center user interface will be
updated only after the chassis is re-discovered through the Power Center discovery
process.
To move a device:
1
Click
Move
.
2
The
Move Device
window displays the physical group structure of the
device on top, and displays a list of physical groups (data center) under it
as active links. If you move a device in the rack, click an active link to
expand the group to display the racks, and then select the rack to which
you want to move the device. If you move a device associated to a physical
group, click an active link to select another group.
3
Click
Move
. The devices are moved to the selected rack or group.
Moving a Physical Group
You can move a physical group, and update the group structure so that it is
similar to the actual data center device structure when a physical group is
moved physically in the data center. The Physical Group can be a room, an
aisle, or a rack.
You must move the physical group according to the following physical group
structure: Data Center Room Aisle Rack.
To move a physical group: