Dell Lifecycle Controller 2 Version 1.3.0 Instrukcja Użytkownika Strona 18

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 157
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 17
Lifecycle Controller IntegrationBest Practices Specification
18
1.7.3 11G and 12G compatibility
Figure 3. Compatibility with 11G Workflows
NOTE: Dotted lines denote the old behavior. Bold red line denotes the new behavior in 12G.
The existing 11G workflows expect the RS status to be in RELOADING state once the job is marked
COMPLETED. So to maintain the compatibility with the 11G workflows, the RS status is artificially held
in the RELOADING state for 90 seconds even though it is actually READY. This time limit was provided
by the console team.
[NOT TOSCALE]
READYFOREXECUTION
SCHEDULED
JobStatus
RUNNING
COMPLETED
GetRSStatus()
RELOADING
READY READY
SYNC
TIME
GetRemoteServicesAPIStatus()
LifecycleController LifecycleControl ler
RemoteServicesisnot
ready. RemoteServicesis ready.
Przeglądanie stron 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 ... 156 157

Komentarze do niniejszej Instrukcji

Brak uwag